Again, it depends on what type of insulation, where it’s going and how much of it.
A straight-forward attic is normally 2 days.
A typical three bed semi, internal and/or external takes about 5 to 7 days including replacing the windows and doors.
A typical three bed semi, floor insulation takes about 5 to 7 days